Construction Update: Building a Strong Foundation for the Grand Hall

The construction crew continues to make strides on the development of our Grand Hall. They are continuing to successfully install the steel framework, and you can see the outline of this 3-story structure beginning to take shape. You can see a rendering of the Grand Hall in our earlier post about the North Wing.

06.24.15 collage 1

The metal decking for each level is being installed in preparation for the elevated concrete slabs. Once the slabs are in place, the floor foundations will be ready for carpet and tile—which will be installed once the structure is fully protected from the elements.

Also, the last of the required footing for the Grand Hall is being poured, and the new components for the boiler system, electrical systems and mechanical systems are being installed.

06.24.15 collage 2

It is very exciting to see this building come to life and we look forward to sharing more updates with you as it continues to develop.

Stay tuned for this week’s Flyer Fact Friday, and keep an eye out for more construction updates coming soon.